Scenario-2.2 Branch Office Network Setup – Configure and Verify Inter-Switch Link Settings

The Scene

Following on from the previous Lab Scenario-2.1 where we applied basic Universal Switch configuration, we will now configure the inter-switch connections.

The Goal

A Static Layer 2 Etherchannel Trunk to be configured between Core-1A and Core-1B.

A Dynamic Layer 2 Etherchannel Trunk using LACP to be configured between UserAcc-1A and UserAcc-1B.

A Dynamic Layer 2 Etherchannel Trunk using PAGP to be configured between UserAcc-1A and UserAcc-1B.

The trunks between the Core Switches and UserAcc Switches should be dynamically negotiated with the Core Switches actively negotiating the trunks.

Continue reading