Scenario-2.1 Branch Office Network Setup – Configure Universal Switch Settings

The Scene

Scenario-2.1

A Collapsed Core switch layer based on two interconnected Layer 3 switches has been installed in the office server room.

Two pairs of User Access Switches have been installed in two different Wire Closet locations.

Two pairs of User Access Switches have been installed in two different Wire Closet locations.

A Management Server located in the Server Room and two Host-PCs have been installed for future use and will be left powered off for the time being.

Continue reading